Postuler

Réf.
2026/IELTE/16154

Type d'offre
Experts

Type de contrat
Contrat de prestation de services

Date limite de candidature
22/09/2026 23:55

Durée de la mission
Court terme

Contrat
Indépendant / Entrepreneur Individuel

Durée
90 Working days

Description de la mission

Context and Justification

GAET Pillar 1 requires a technically robust and traceable system for calculating embedded emissions, preparing product carbon footprints, establishing monitoring, reporting and verification (Monitoring, Reporting and Verification) arrangements, and demonstrating CBAM readiness for three Egyptian automotive and E&E pilot firms. The assignment will translate relevant ISO standards and CBAM requirements into methods, emission factors, site-level data systems, monitoring plans, training materials, pre-verification support, and firm-level PCF outputs from October 2026 to September 2027, leaving a buffer before the programme closes on 31 December 2027.

The Lead Technical Expert will work in close coordination with the Team Leader, the GTF, EEAA, MTI, the Steering Committee, the three pilot firms, and any verifier or OEM procurement contacts authorised by the firms. The role requires rigorous data governance, transparent methodological choices, practical field deployment, bilingual technical communication, and protection of confidential firm-level information.

Description du projet ou contexte

Objectives and Expected Results

1. General Objective

To establish and operationalise an ISO- and CBAM-aligned technical foundation for embedded-emissions calculation, GHG monitoring, product carbon footprinting, and verification readiness in the three pilot firms and the wider automotive and E&E sector.

2. Specific Objectives

• Reconcile ISO 14067:2018, ISO 14040/14044, and CBAM Annex IV into a practical baseline methodology for the programme.

• Develop an Egypt grid emission factor using the specified IPCC methodology and cross-validation sources, and prepare a simplified emission-factor library for priority manufacturing processes.

• Conduct pilot-firm site visits, collect and assess primary data, identify data gaps, and prepare firm-level and sector-level carbon baseline studies with financial exposure analysis.

• Design and pilot a bilingual automotive and E&E Monitoring, Reporting and Verification protocol, monitoring plans for each firm, and capacity-building workshop materials.

• Prepare the pilot firms for pre-verification, conduct dry-run coordination, and develop ISO 14067-compliant PCF reports in a format compatible with Catena-X IRS 0080.

• Prepare the CBAM Readiness Assessment and Proof of Concept Report jointly with the Team Leader, ensuring that technical findings support scale-up investment decisions.

3. Expected Results

• A GTF-endorsed Baseline Methodology Note that documents standard reconciliation, system boundaries, allocation rules, 80/20-rule guidance, and the ISO 14044 data-quality scoring framework.

• An EEAA-endorsed and published Egypt Grid Emission Factor Technical Report and a GTF-approved Simplified Emission Factor Library v1.0 with sources, Egypt-specific adjustments, data-quality scores, provisional flags, and a Year 3 expansion plan.

• Three site-visit reports and a Carbon Baseline Study covering the pilot firms, sector synthesis, process hotspots, data quality, actual-versus-default comparisons, and quantified financial savings under three ETS price scenarios.

• A bilingual, GTF-endorsed Automotive and E&E Sector Monitoring, Reporting and Verification Protocol; three firm monitoring plans; bilingual workshop materials; and documented post-training competency results.

• Pre-verification preparation reports, pre-verification dry-run coordination reports, and three ISO 14067-compliant PCF reports with product-level emissions, CBAM default comparisons, and Catena-X IRS 0080 compatibility confirmation.

• A GTF-endorsed CBAM Readiness Assessment and Proof of Concept Report, CBAM Readiness Dashboard, sector saving model, and mapped scale-up investment case.

Description of the Assignment / Key Responsibilities

The Lead Technical Expert will lead the technical workstream for LCA, PCF, GHG accounting, Monitoring, Reporting and Verification, monitoring-plan deployment, and verification readiness. The expert shall ensure that all methods and outputs are traceable to the specified ISO standards, CBAM Annex IV, and the GAET Policy Framework as it becomes available.

Key Responsibilities

• Prepare the Baseline Methodology Note, including reconciliation of ISO 14067:2018, ISO 14040/14044, and CBAM Annex IV; system boundaries; allocation rules; 80/20-rule guidance; and data-quality scoring.

• Prepare the Egypt Grid Emission Factor Technical Report using the IPCC 2006/2019 Tier 2 methodology, a 2021–2023 rolling average, and documented cross-validation against IEA and UNFCCC sources.

• Develop the Simplified Emission Factor Library v1.0, documenting source versions, Egypt-specific adjustments, ISO 14044 data-quality scores, provisional factors, and the Year 3 expansion plan.

• Plan and conduct site visits to the three pilot firms, prepare reports within five working days of each visit, collect primary data, map metering and processes, assess data quality, and maintain a structured data-gap log.

• Prepare the Carbon Baseline Study, sector synthesis, CBAM financial-exposure report, and investment-priority mapping in coordination with the Team Leader and the GTF.

• Design, bilingualise, pilot, and finalise the Automotive and E&E Sector Monitoring, Reporting and Verification Protocol and three firm-specific monitoring plans, including Excel data-recording templates, internal QC procedures, data custodians, and workshop materials.

• Support pre-verification preparation and dry runs, identify and categorise non-conformities, support corrective actions, prepare verifier briefing notes, and confirm firm readiness ratings.

• Prepare three ISO 14067-compliant PCF reports and the CBAM Readiness Assessment and Proof of Concept Report, including the CBAM Readiness Dashboard and scale-up investment case.

• Execute NDAs with each pilot firm before the first site visit and ensure that all firm-level data are handled in accordance with the NDA terms throughout the assignment.

Anticipated Deliverables

The following deliverables, deadlines, and level of effort reproduce the GAET Pillar 1 scope. Deliverables shall be submitted in a professionally edited format and shall be accepted by the designated programme governance body or authority identified in the relevant acceptance criterion.

Deliverable

Deadline

Estimated Days

Baseline Methodology Note

Month 2 (November 2026)

6 days

Egypt Grid Emission Factor — Technical Report

Month 3 (December 2026)

9 days

Simplified Emission Factor Library v1.0

Month 4 (January 2027)

8 days

Site Visit Reports — 3 Pilot Firms

Month 5 (February 2027; all 3 firms)

12 days

Automotive E&E Sector Monitoring, Reporting and Verification Protocol

Month 5 (February 2027)

9 days

Carbon Baseline Study — 3 Firms + Synthesis + CBAM Financial Exposure Report

Month 6 (March 2027)

11 days
Acceptance criteria for firm reports: ISO 14067 conformance statement; Scope 1, 2, and 3 upstream emissions itemised; process-level hotspot analysis identifying the top three sources per firm; actual-versus-CBAM-default comparison with financial saving quantified in EUR/year per firm at three ETS price scenarios; data-quality section. Acceptance criteria for synthesis: sector aggregate embedded emissions; structural drivers identified; Pillar 2 investment priorities mapped; GTF co-signature on sector synthesis.

3 Firm Monitoring Plans + Workshop Materials

Month 8 (May 2027)

13 days
Acceptance criteria for monitoring plans: individual plan per firm; all emission sources and sinks listed; measurement/calculation method and frequency specified per source; data custodian named; internal QC procedure documented; plant-manager co-signature. Acceptance criteria for workshop materials: Modules A, B, and C complete; bilingual Arabic/English; post-training competency assessment scores of at least 80% for at least two participants per firm documented; all materials published on the MTI website.

2 Pre-Verification Preparation Reports

Month 10 (July 2027)

7 days

3 ISO 14067-Compliant PCF Reports

Month 12 (September 2027)

8 days

2 Pre-Verification Dry Run Coordination Reports

Month 12 (September 2027)

3 days

CBAM Readiness Assessment + Proof of Concept Report

Month 12 (September 2027)

4 days
Acceptance criteria, co-authored with the Team Leader: actual-versus-CBAM-default delta documented for all three firms; aggregate sector saving modelled; scale-up investment case quantified; CBAM Readiness Dashboard produced; published on the MTI website; presented at GTF Plenary P4.

Quality Acceptance Criteria

Baseline Methodology Note — Acceptance criteria: explicit reconciliation of ISO 14067:2018, ISO 14040/14044, and CBAM Annex IV, with each divergence identified and resolution documented; system boundary defined as cradle-to-gate; allocation rules for multi-product facilities; 80/20-rule application guidance for automotive and E&E components; data-quality scoring framework based on ISO 14044 DQS; GTF endorsement obtained.

Egypt Grid Emission Factor — Technical Report — Acceptance criteria: IPCC 2006/2019 Tier 2 methodology applied; three-year rolling average for 2021–2023 calculated; cross-validation against IEA Egypt Electricity Information 2024 and UNFCCC Egypt BUR documented; discrepancies greater than 5% explained and reconciled; EEAA President endorsement letter obtained and annexed; published on MTI and EEAA websites.

Simplified Emission Factor Library v1.0 — Acceptance criteria: at least five process categories covering the highest-exposure manufacturing processes for the three pilot firms’ product mixes; each factor sourced from ecoinvent 3.10, GaBi, or GREET with source version cited; Egypt-specific adjustments documented with primary-data reference; ISO 14044 DQS assigned to each factor; factors with DQS below 3 flagged as provisional; GTF technical approval obtained; Year 3 expansion plan to 12 categories annexed.

Site Visit Reports — 3 Pilot Firms — Acceptance criteria: one report per firm within five working days of each visit; process-flow diagram; metering-infrastructure map; completed primary-data collection template; data-quality assessment per data point, distinguishing measured, estimated, and default data; list of data gaps requiring follow-up; firm environmental officer co-signature confirming data accuracy.

Automotive E&E Sector Monitoring, Reporting and Verification Protocol — Acceptance criteria: Part A technical standard—each monitoring provision cites its regulatory source, including CBAM Annex IV, ISO 14064-1, or the GAET Policy Framework; measurement and calculation methodology specified for each emission-source category; uncertainty analysis included. Part B operational manual—self-applicable by an environmental officer without external support; monthly data-recording Excel template included and tested; bilingual Arabic/English version produced; pilot-tested at at least one firm with corrections incorporated; GTF formal endorsement obtained.

2 Pre-Verification Preparation Reports — Acceptance criteria: one report per firm before verifier engagement; review of at least three months of monitoring data against the monitoring plan; all data gaps and non-conformities identified and categorised as minor or major; corrective actions implemented and evidenced before the verifier site visit; verifier briefing note annexed.

3 ISO 14067-Compliant PCF Reports — Acceptance criteria: ISO 14067:2018 conformance statement signed by the Lead Technical Expert; PCF expressed in kg CO2eq per unit product for each firm’s top three product references; Scope 1, 2, and 3 upstream presented separately; CBAM default-value comparison table; Catena-X IRS 0080 format compatibility confirmed; GTF endorsement; transmitted to each pilot firm and to OEM procurement contacts where the firm has consented.

2 Pre-Verification Dry Run Coordination Reports — Acceptance criteria: one report per firm after the verifier dry run; verifier non-conformity log annexed; the Lead Technical Expert corrective-action support documented; firm readiness rating confirmed as verification ready, conditionally ready, or not ready; estimated timeline to formal verification readiness provided.

The level of effort has been reconciled to 90 contracted days. The assignment is scheduled to close in September 2027 (Month 12), leaving a buffer before the programme closes on 31 December 2027.

Profil souhaité

Required Expertise and Profile

Qualifications and Skills

• Advanced university degree in environmental engineering, chemical or process engineering, environmental science, energy systems, climate science, industrial ecology, or a related field.

• Documented technical expertise in life-cycle assessment (LCA), product carbon footprinting (PCF), GHG accounting, Monitoring, Reporting and Verification, industrial emissions, or CBAM implementation.

• Strong working knowledge of ISO 14067:2018, ISO 14040/14044, ISO 14064-1, CBAM Annex IV, and data-quality assessment approaches based on ISO 14044.

• Ability to develop transparent emission factors, apply IPCC methodologies, assess grid emissions, document uncertainty, and manage primary, estimated, and default data.

• Ability to design practical monitoring protocols, Excel data-collection tools, firm-specific monitoring plans, bilingual training materials, and internal QC procedures.

• Experience preparing or supporting verification-ready GHG, PCF, or CBAM documentation and assessing non-conformities and corrective actions.

• Ability to produce clear technical reports in English and support bilingual Arabic/English outputs and training materials.

• Strong data-governance, confidentiality, stakeholder-engagement, and field-mission skills, including compliance with pilot-firm NDAs.

General and Specific Professional Experience

• Substantial professional experience in LCA, PCF, GHG inventories, Monitoring, Reporting and Verification systems, industrial emissions, environmental data management, or related technical advisory work.

• Direct experience applying ISO 14067, ISO 14040/14044, ISO 14064-1, the GHG Protocol, CBAM requirements, or comparable carbon-accounting standards.

• Experience developing emission-factor libraries, grid emission factors, process-level baselines, uncertainty analyses, or data-quality scoring systems.

• Experience conducting industrial site visits and deploying data-collection and monitoring systems in manufacturing facilities, preferably automotive, E&E, or other complex industrial sectors.

• Experience preparing verification or pre-verification packages, PCF reports, monitoring plans, verifier briefing notes, or corrective-action plans.

• Experience with Catena-X, IRS 0080, OEM carbon-data requirements, or equivalent product-carbon-data exchange formats is highly relevant.

Application Modalities

Form of Contract

Individual expert / consultancy contract, subject to the applicable procurement documentation.

Submission Deadline

To be confirmed in the procurement notice.

Start Date

October 2026, following contract signature or notification of award; the first technical deliverable is due in October 2026.

End Date

September 2027; all contractual deliverables, final reporting and readiness support completed.

 

Application Requirements

• A technical offer including a detailed curriculum vitae, academic qualifications, professional certifications, and assignment descriptions demonstrating compliance with the required technical expertise and profile.

• A description of the proposed approach and methodology, including a workplan aligned with the programme phases, all deliverables, acceptance criteria, site-visit requirements, data-governance arrangements, quality assurance, training, pre-verification, and PCF preparation.

• A financial offer including the proposed daily rate, total fee based on 90 contracted days, and any applicable reimbursable-cost assumptions in the currency specified in the procurement notice.

• At least two comparable professional references. Each reference should state the project title and description, contracting authority, duration, role performed, contact details, and supporting evidence where available, such as contracts, attestations, or published outputs.

• A written commitment to execute an NDA with each pilot firm before the first site visit and to comply with the applicable requirements for confidential firm-level data throughout the assignment.

• A declaration of availability for the 12-month assignment period, site visits and technical activities.

• Incomplete bids may be excluded from evaluation in accordance with the procurement rules stated in the final solicitation notice.

Evaluation Criteria

Bids will be assessed separately in accordance with the following proposed publication matrix. Conforming bids will receive a financial score out of 30 points and a technical score out of 70 points. The contracting authority should confirm the final thresholds and scoring weights before issuing the solicitation.

Criterion 1: Price of the Services

The financial score (FS), out of a maximum of 30 points, shall be calculated among candidates that have submitted a conforming financial offer using the following formula: FS = (lowest conforming financial offer / candidate’s conforming financial offer) × 30.

Criterion 2: Technical Offer

Sub-criteria for assessing the technical quality

Maximum number of points

Expert Profile CV, Academic Qualifications and Certifications
Scoring:
- Fully relevant profile aligned with the TOR: 10 points
- Partially relevant profile: 7 points
- Not relevant or insufficiently documented profile: 0 points

10

Expert Experience in the Related Field
Relevant experience in LCA, PCF, GHG accounting, Monitoring, Reporting and Verification, CBAM, industrial emissions, emission-factor development, and technical field deployment.
Scoring:
- Extensive and directly relevant experience covering at least four areas, including industrial or pilot-firm implementation: 20 points
- Substantial experience covering three areas: 15 points
- Limited experience covering one or two areas: 8 points
- No evidenced relevant experience: 0 points

20

Approved Similar Assignments
Assessment of up to two references against the required expertise and profile.
Scoring:
- Each fully relevant and verifiable reference: 10 points
- Each partially relevant reference: 5 points
- Not relevant or unverifiable reference: 0 points

20

Approach and Methodology for Carrying Out the Assignment, including a Workplan Aligned with the Deliverables, Timeline and Scope Defined in the TOR
Scoring:
- Full score: clear 12-month workplan covering standards reconciliation, emission factors, site visits, data quality, Monitoring, Reporting and Verification, monitoring plans, bilingual training, NDA compliance, pre-verification, PCF reporting and Catena-X compatibility
- Average score: partially aligned workplan with material omissions or timing adjustments
- Zero score: approach and workplan not aligned with the TOR

20

TOTAL TECHNICAL SCORE

70

Scoring note: the criteria above are drafted from the GAET deliverables and required capabilities. Any mandatory eligibility threshold, minimum technical pass mark, or procurement-specific rule should be inserted by the contracting authority before publication.

Submission

The complete application package shall be sent by 22nd Sep  2026 at 5:00 P.m. UTC through our Gestmax platform (EF website)

 

 

 

Informations complémentaires

Note: 

 

-        Incomplete applications, including those missing the Technical Offer, Financial Offer, or any required supporting documents, will not be considered.

-        Applications will be assessed on a rolling basis, and the consultancy may close before the deadline if a sufficient number of qualified candidates are identified.

-        Please consolidate all application files into one document so that you can upload a single file.

Critères de sélection des candidatures

Le processus de sélection des candidats s'opérera selon le(s) critère(s) suivant(s) :

  • Formation/compétences/expériences du candidat

Date limite de candidature : 22/09/2026 23:55

Ce site web utilise des cookies pour la réalisation des statistiques de visites. Ils nous permettent également d'assurer un bon fonctionnement de nos services. En poursuivant votre navigation, vous acceptez l'utilisation de ces cookies.
Pour plus d'informations, Lire la politique des cookies >>.